An NDA before sharing technical materials: what to agree with your counterparty

A confidentiality agreement should reflect how information is actually handled. This is particularly important when a counterparty receives drawings, samples and source files for testing or preparing technical documentation.

The key issue. Delivery of materials, permission to use them and rights to future results must be agreed separately.

The drafting task

In September 2026, a negotiation draft of an NDA was prepared for a project involving one organisation sharing technical information and materials with another for work to be performed. The task was to protect the original information while establishing clear rules for its use within the project.

The draft addressed protected information, evidence of transfer, access by employees and contractors, liability, and return and deletion of copies. The materials contain no confirmation that the parties signed the final text.

Defining what is shared

The broad phrase ‘any information’ is awkward to prove later. Describe categories of information and record specific files, document versions, media and samples. The draft provides for transfer certificates, inventories and email records.

Check when confidentiality obligations arise: only after special marking, or also when information is plainly non-public. Avoid an unintended gap where an unsigned individual transfer certificate leaves materials actually received without contractual protection.

Separating purposes and rights

A counterparty may need access for tests and preparing a proposal. That should not automatically permit use in its own products, disclosure to competitors or registration of rights in derivative developments.

Restrictions should not obstruct independent activities that do not use protected information. Rights to results created under the main contract must be agreed separately: an NDA does not replace provisions allocating ownership of paid-for developments and documentation.

Managing access as well as prohibitions

The authorised persons, their functions, access levels and subcontractors' obligations matter in practice. The draft proposes approval of third-party contractors and a designated person responsible for storage and transfer controls.

If an incident occurs, notification, access restriction and preservation of evidence matter. The notification period should allow action, rather than become a formality after information has spread. Check that the required actions are technically feasible.

Liability and project closure

Discuss not only the penalty amount but also what constitutes one breach, the relationship between penalties and damages, liability limits and avoiding double recovery for the same event. These provisions remain subject to negotiation in a working draft; disputed terms cannot be treated as agreed.

At project closure, agree return of originals and samples, deletion of working copies and permitted archival retention. Backup deletion cycles and restrictions on ordinary access must be considered. An NDA alone does not establish that all statutory trade-secret safeguards have been introduced; internal procedures require separate assessment.

Documents needed

  • The draft NDA and main contract
  • An inventory of shared materials and the purpose of access
  • Employees and contractors requiring the information
  • Requirements for work results, storage and deletion

Procedural stage and confirmed outcome

This article is based on a September 2026 NDA negotiation draft with working amendments. It describes negotiation issues and does not claim the text was signed, disputed terms accepted or later leaks prevented.

Legal references

This publication reflects the circumstances of a particular matter as at its publication date. Your situation requires a review of the relevant documents.

Discuss your matter with an advocate ↗
CallContact →