Missing the contract signing deadline: demonstrating a supplier's good faith

Missing the signing deadline exposes a successful bidder to inclusion in the Register of Unscrupulous Suppliers. The defence requires a consistent chronology and documents explaining the company's conduct before and after the breach.

The key issue. The explanation for missing a deadline must be supported by the supplier's actions and specific evidence.

A matter from practice

In July 2026, explanations were prepared for a supplier that had not signed a draft contract on time. The information supplied indicated that an employee was working remotely and intended to connect to an office computer configured for electronic signing. On the final signing day, the connection failed.

After discovering the missed deadline, the company confirmed its readiness to perform. The materials included documents showing arrangements with the manufacturer and the ability to organise delivery. The explanations did not deny the missed deadline. The defence sought to explain its causes and demonstrate the continuing intention to enter the contract.

The basis of the position

Two questions were distinguished: compliance with signing procedure and assessment of the supplier's conduct in RNP proceedings. For the latter, actions taken before the bidder was declared to have evaded signing matter alongside statements of intent.

The position included the chronology, readiness of goods, manufacturer relationships and subsequent communications with the authority. The connection failure was assessed alongside work arrangements: who was responsible, when the problem arose and what alternatives existed.

Paragraph 41 of the Russian Supreme Court's Review of 28 June 2017 was also considered: lack of intent to evade and steps taken to conclude the contract are relevant to RNP inclusion. This approach must be assessed against the particular procurement's circumstances.

Why an outage certificate alone is insufficient

General information about connection interruptions does not itself establish that this supplier could not sign. Link the event to the inability to perform the specific action during the available period through support requests, error logs, employee messages and workstation access records.

Do not automatically describe every technical failure as force majeure. Its nature, backup access and mitigation steps matter. A history of completed contracts supports the position but does not replace an explanation of the disputed event.

Steps in a similar situation

  • Preserve the draft contract, platform messages and exact time of every action.
  • Record the technical problem and support requests without altering original files.
  • Check what steps were taken before the bidder was declared to have evaded signing.
  • Support readiness to perform with documents on goods, security and delivery arrangements.
  • Prepare a written chronology and an explanation for each attachment.

A backup responsible person and checking signing progress before the final day help reduce repeat errors. These measures alone do not determine the outcome of an existing dispute.

Documents needed

  • Procurement documents and the draft contract
  • The FAS notice and record declaring evasion of signing
  • Error logs, support requests and correspondence
  • Documents confirming readiness of goods and performance security

Procedural stage and confirmed outcome

This article is based on written explanations prepared in July 2026. The materials contain no commission decision on the referral; no refusal of RNP inclusion is claimed here.